MINUTES OF THE MEETING HELD ON
Location: The Village Hall,
Beckwithshaw
Present: Councillors
– Cllr M Clarke, Cllr I Galloway (Chair), Cllr D Naylor, Cllr Mrs J Ryder, Cllr
Mrs K Wilson, CCllr J Fort, DCllr R Grange.
Parish Clerk – Mrs J Naylor.
The Parish Council meeting
commenced at
1. Apologies: Cllr
Mrs J Cann.
2. Urgent
Business:
Parish Councils Complaints Procedures: Copies of
the procedures had been circulated for review prior to the meeting; Cllr
Galloway proposed that they be adopted by the Parish of Haverah Park with
Beckwithshaw and was seconded by Cllr Mrs Wilson.
Speed Training for Communities: Cllr
Galloway reported that this event had been attended by Cllrs Galloway and Naylor
together with the Parish Clerk. The event was informative and beneficial
although its focus was primarily on incidents involving flooding.
3. Public
arrangements (Questions, E-mails etc.): None
4. Minutes of the meeting
held on
Matters arising:
Wind Farm Grants: Cllr Mrs Wilson
reported that this had been reviewed but unfortunately, funds are not available
for use by Parish Councils although they are available for use by the Village.
Details have been passed to the Village Hall Committee.
5.
·
Full responsibility for Highways
was transferred to North Yorkshire County Council on
· A Highways Inspector (James Malcolm) was due to inspect the roads (curbing and potholes) in the Parish on Friday 9th April.
· Education facilities, for pupils with special needs, at Forest Moor have been signed off. It is anticipated that the new facilities will be available in September 2010.
6. District Councillor’s Report: DCllr Grange reported that:
·
Grates and man-hole covers were
being removed from the sides of roads creating a danger to vehicles and
pedestrians.
7. Highways:
As reported at the Open Meeting, Cllr Naylor confirmed that North
·
New/improved warning signs on
the approach to the bend on
·
The installation of improved
junction warning signs on the bend itself which will incorporate the words
“Side Road Ahead” (i.e.
·
Install junction edge of
carriageway road markings and verge marker posts immediately before
·
For traffic travelling north (i.e.
in the direction of Leathley), the two existing “Bend Ahead” signs will be
removed and replaced with ones which incorporate the advisory wording “Maximum
Speed 30mph”.
· Prior to the existing 30mph restriction signs (i.e. for vehicles approaching from the Leathley direction) new 2900mm”Slow” road markings will be introduced.
North Yorkshire County Council had advised that a definite date cannot be
confirmed as the programme is dependent on available budget/funds.
Following the discussions in the Open Meeting it was agreed that a Road Safety
Survey should be prepared for completion by Parishioners before further
action/investigation is undertaken. It was also agreed that to progress this
area of concern, it would be beneficial for the
8.
Finance:
The bank balances at 6th April were reported to the Parish Council:
£
Deposit Account 1422.55
Money Manager Account 941.59
Total 2364.14
· The Parish Clerk submitted a claim for £74.80
covering expenses and postage for the recent Parish Newsletter: payment was
proposed by Cllr Mrs Ryder and seconded by Cllr Mrs Wilson.
· Cllr Mrs Wilson agreed to contact Mr I Bullock
to initiate cutting the grass verges. It was agreed that investigations should
be undertaken to determine if these costs could be recovered from commuted
sums.
· The Parish Clerk confirmed that details for the
annual accounts have been received and that they have to be submitted before
9. Correspondence:
Meadow Barn, Beckwithshaw: The Parish Clerk reported that correspondence had been received confirming that following the recent flooding of Meadow Barn, it had been identified that the old culvert had been blocked by tree roots. After discussions with Harrogate Borough Council a proposal had been made to replace the old stone lining with a modern pipe. The Parish Clerk was requested to write to the representative confirming that the Parish Council:
· Had no objection to the proposals to replace the stone lining but had been advised that the diameter of the replacement plastic pipe must be no less than 18inches.
· Anticipate that the verges and original stone wall will be re-instated with appropriate flood relief apertures and that this will be done within three months.
· Will be happy to be involved in any discussions with the completion of the proposed works.
Membership
of
Code
of Conduct for Parish Councillors – Training in the Harrogate District: It was reported that training seminars will be
held on 19th May and 7th September.
10. CAP (Community and Policing) Meeting:
The next meeting is to be held on Wednesday 2nd June at Beckwithshaw
Village Hall.
A Parish Newsletter will be issued confirming details and it was agreed that
the Road Safety Survey should be included in the distribution.
11. Update on the Copse:
Cllr Mrs Wilson reported that apprentices from the
12.
Planning Matters:
6.120.26.X.FUL
10/00272/FUL – Installation of replacement generator set and
The Parish Council had no objections.
Holen
House Farm, Beckwithshaw HG3 1TL: Notification received of proposal to fell 1.2
hectares of coniferous trees (Forestry Commission ref: 012/151/09).
Notices of decision of planning applications:
6.120.67.1.FUL – Conversion of part of
mistal to form holiday cottage site – Beckwith Farm, Beckwith HG3 1QQ (Mrs
Jeffries).
Planning
granted subject to condtions.
Planning Enforcement:
6.120.57.I.FUL – Beechfield Farm, Beckwithshaw HG3 1QL. A complaint had been received re: non-compliance with Condtion 2 of 6 (Landscaping).
It was noted
that comments had been made at the Open Meeting that advertisements had been
placed in the Harrogate Advertiser for the use of equestrian/livery facilities
at Beechfield Farm; this is in contravention of planning conditions. The Parish
Clerk to confirm this breach to the Planning Department.
13. Councillors Questions: None
14. Any Other Business:
Horse muck: At the Open Meeting a number of parishioners had reported that it was not
only unacceptable for horses to be exercised on the public footpaths but horse
muck was being deposited, making it difficult for pedestrians, particularly on
Otley Road. The Parish Council agreed to communicate these concerns to the
owners of nearby livery facilities (Beavers and Pennine View Farm).
15. Date of next meeting: Tuesday 11th May at
The meeting closed at
SUMMARY OF ACTIONS
|
No. |
Action |
Responsibility |
|
1 |
Update website with
photos of councillors |
Ian Galloway |
|
2 |
Prepare survey re:
road calming/safety |
All |
|
3 |
Obtain contact
details for Army Apprentices Collge for letter of thanks. |
Kathryn Wilson |
|
4 |
Prepare year end
accounts. |
Jasmine Naylor |
|
5 |
Prepare news letter re
CAP Meeting and road safety survey. |
Ian Galloway |
|
6 |
Obtain costing for
installation of a mini roundabout. |
John Fort |
|
7 |
Confirm requirement
for Village Verge grass cutting |
Kathryn Wilson |
|
8 |
Confirm if payment
for grass cutting is recoverable from commuted sums. |
Jasmine Naylor |
|
9 |
Write to Planning –
HBC re~: alleged breach of Planning by Beechfield Farm. |
Jasmine Naylor |
|
10 |
Write to livery
stables re: Parishioners concerns re: horse muck on footpaths. |
Jasmine Naylor |
|
11 |
Response to
representative of Meadow Barn re: proposed remedial works, |
Jasmine Naylor |